Performing the Initial Start-up
NOTICE - |
Prior to use, thoroughly clean unit as described in Operator's Manual. |
-
To put the unit into operation, move the power switch to the ON position. The power indicator should now be illuminated and the blowers should be in operation.
-
Remove the water pan and put approximately 1 inch of hot water in the pan. Return the pan to its location.
NOTICE -
Be sure to push the water pan in as far as it will go so that it does not block air from the thermometer and thermostat capillary tubes. This will ensure proper operation of these components.
-
Set the thermostat at #7 or approximately 180°F (82°C). When the heat light goes out, the unit is ready for operation.
The unit should take approximately 25-35 minutes to heat to temperature during start up. Be sure that the temperature light goes out before loading with product.