Assembling the ODS 400
Heavy Object Take care when moving the shuttle components to prevent personal injury. The shuttle weighs:
|
Remove these parts and discard. They are not used.
-
Using nuts and bolts provided, attach handle to shuttle.
-
Clean the threads, and then apply thread tape or sealant to connections.
-
Attach the pump handle to the pump.
-
Slide pump and tube assembly through square tubes on bracket and secure with thumbscrew.
-
Apply pipe sealant or thread tape to threads of pipe fitting and attach hose assembly to top of pump.
-
Locate filter hose holder and slide holder into holder bracket and then slide the filter hose assembly into holder.
-
Hang the pressure fryer “funnel” on handle.